Containerized Wastewater Treatment Plant

Product Overview

Containerized (packaged) plants house a complete treatment process inside standard containers or skids, factory-assembled and shipped ready to operate for fast deployment and remote sites.

Plug & playfactory-built
5–500m³/day per unit
Minimalsite civil works

Working Principle

A pre-engineered treatment train, often MBBR or MBR, is integrated within a container and factory-tested, then delivered for rapid on-site connection to power and piping.

Key Features

  • Factory-assembled and pre-tested
  • Rapid deployment and relocation
  • Minimal civil works
  • Available with MBBR or MBR processes

Advantages

  • Fast installation and commissioning
  • Ideal for remote or space-limited sites
  • Predictable, factory-controlled quality

Applications

  • Remote camps and sites
  • Construction projects
  • Temporary or emergency needs
  • Small to medium communities

Technical Specifications

Indicative typical ranges to guide planning. Exact parameters are engineered and confirmed for each project based on your flow rate, influent quality and target discharge standard.

Parameter Specification
Treatment capacity (m³/day) 5 – 500 m³/day per unit (20ft / 40ft); parallel-scalable
Influent quality (BOD / COD / SS) Municipal or pre-treated industrial (per configuration)
Target effluent standard Meets discharge / reuse per selected process (MBBR / MBR / AO)
Process type Packaged biological process inside an ISO container
Footprint / installation Plug-and-play; minimal civil works; relocatable
Power supply Per selected process (≈0.3–1.2 kWh/m³)
Material of construction ISO container shell + internal SS / GRP modules
Operation mode Pre-assembled, fast deployment, optional remote monitoring

Process Flow

  1. Pre-treatment
  2. Containerized biological treatment
  3. Disinfection
  4. Discharge or reuse

Frequently Asked Questions

How fast can a containerized plant be deployed?

Because it is factory-built and tested, on-site setup is mainly connection of services; schedules are confirmed per project.

Can it be relocated?

Yes. Containerized plants are designed to be moved between sites.

Which process is inside?

Typically MBBR or MBR, selected to match flow and effluent requirements.

Quality & Assurance

Every Hydrex Eco system is built to order and function-tested before shipment.

ISO 9001ISO 9001Quality Management
CE MarkingCE MarkingEU Conformity
SGS VerifiedSGS VerifiedIndependent Inspection

Request a Quote

Tell us your flow rate, wastewater source and target standard and our engineers will respond with a tailored proposal.

WhatsApp Email Us Contact Us
Scroll to Top
WhatsAppEmail UsContact